Tremie

From WikiMD's Food, Medicine & Wellness Encyclopedia

Tremie operation
Tremie components

Tremie is a method used in civil engineering and construction for pouring concrete underwater or in situations where keeping the concrete dry is impossible. The technique involves using a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. The lower end of the pipe is submerged in the fresh concrete being placed, thus preventing water from mixing with the concrete by keeping the pouring end interlocked with the concrete mass. As concrete is denser than water, it displaces the water as it is poured and prevents dilution and segregation of the mix.

Usage[edit | edit source]

Tremie pipes are widely used in underwater construction projects such as:

  • Foundations for bridges
  • Dock and harbor constructions
  • Sealing off water ingress in tunnels and shafts
  • Underwater pipeline bedding

The tremie method is favored in these scenarios due to its ability to place a large volume of concrete continuously and efficiently in a controlled manner. This method ensures the quality and integrity of the concrete structure by minimizing the risk of segregation and enhancing the bonding with previously placed material.

Equipment[edit | edit source]

A tremie setup typically consists of:

  • A hopper at the top where concrete is introduced
  • A long pipe, which can be made of sections that are added as the depth increases
  • A valve or plug at the bottom to prevent water from entering the pipe before the concrete pour begins

The diameter of the tremie pipe usually ranges from 200 to 300 mm, allowing for the easy flow of concrete. The pipe sections are often made of metal or plastic and are connected in a way that prevents leakage of the concrete.

Procedure[edit | edit source]

The tremie concrete placement process involves several key steps: 1. Assembly of the tremie pipe and securing it in the desired location. 2. Sealing the bottom of the pipe, often with a check valve or an initial plug of more solid material that can be pushed out by the concrete. 3. Filling the hopper and pipe with concrete, ensuring that the flow is continuous to prevent the concrete from setting prematurely. 4. Gradually raising the pipe as the concrete level rises, while keeping the pipe end submerged to prevent water from entering. 5. Ensuring that the concrete is of a suitable mix and consistency to flow easily through the pipe and fill the required space without segregating.

Advantages[edit | edit source]

  • Minimizes the risk of concrete segregation
  • Allows for deep underwater concrete placement
  • Ensures a high-quality, dense, and homogeneous concrete structure

Disadvantages[edit | edit source]

  • Requires specialized equipment and expertise
  • Can be more costly than other methods due to the complexity of the operation
  • The success of the method is highly dependent on the skill of the operators and the quality of the concrete mix

Conclusion[edit | edit source]

The tremie method is an essential technique in modern construction, particularly for underwater and wet condition projects. Its ability to deliver concrete to difficult-to-reach locations while maintaining the integrity of the mix makes it invaluable for ensuring the structural stability and longevity of marine and subterranean structures.

Wiki.png

Navigation: Wellness - Encyclopedia - Health topics - Disease Index‏‎ - Drugs - World Directory - Gray's Anatomy - Keto diet - Recipes

Search WikiMD


Ad.Tired of being Overweight? Try W8MD's physician weight loss program.
Semaglutide (Ozempic / Wegovy and Tirzepatide (Mounjaro) available.
Advertise on WikiMD

WikiMD is not a substitute for professional medical advice. See full disclaimer.

Credits:Most images are courtesy of Wikimedia commons, and templates Wikipedia, licensed under CC BY SA or similar.


Contributors: Prab R. Tumpati, MD